Fee Schedule

Code Enforcement Permit Fees (As of spring 2006):

PermitFee

Demo Permit (Using Building Permit Application)

$30.00

Permanent Signs

$25.00

Temp. Signs

$20.00

Septic Designs

$45.00

Mechanical

$50.00

Plumbing

$50.00

Electrical

$50.00

Oil Burner (permit from fire dept.)

$25.00

Tree Cutting (CSPA)

plan of first 50’ from lake (no fee)

Building - Unheated / unfinished spaces

.11 cents per square foot

Building - Heated / finished spaces

.22 cents per square foot

Building - Minimum fee

$30.00

Building permit fees are calculated from the exterior dimensions of the structure. Only the calculations done by the Code Enforcement office are accepted. All fees rounded to the dollar.

Fines for working without a permit - A fee based on the schedule below:

For working without a permit, a fee of two (2) times the cost of the permit, plus the cost of the permit will be assessed.

Donald E. Cahoon
Code Enforcement Officer
January 31, 2014